| Panel | ||||||||
|---|---|---|---|---|---|---|---|---|
| ||||||||
On this new Server location, use the search box: |
| Live Search |
|---|
This Website is organized in Spaces, each Space contains pages. The most pages are in https://diysynth.wiki.dsl-man.de/wiki/spaces/DSO for example 303,606,808,909 clones.
Standalone effects and LA2A clones for example in the Outboard Projects
Very big projects has own spaces, for example TTSH, ISE-NIN, Antonus2600.
5U Modules in MOTM and MU Format has a own space too Modular in 5U projects
all Spaces:
| Spaces List (Deprecated) |
|---|
| Popular Labels | ||||
|---|---|---|---|---|
|
2024 Videos
https://www.youtube.com/shorts/30OYed09i3M
https://www.youtube.com/shorts/ULGxiDsfEY0
https://www.youtube.com/shorts/2e6_54p1Lkw
| Popular Labels | ||||||
|---|---|---|---|---|---|---|
|
| Popular Labels | ||||||
|---|---|---|---|---|---|---|
|
| Spaces List (Deprecated) |
|---|
General Safety warning
Installation only by people with relevant electrical engineering knowledge and experience.
Improper installation puts you at risk:
•
your own life.
The life of the users of the electrical system.
With an improper installation you risk serious material damage, e.g. Fire.
You are at risk of personal liability for personal injury and property damage.
Contact a person with appropriate expertise.
| Note |
|---|
The 5 safety rules
|
Evaluation of the measurement results.
Selection of electrical installation material to ensure shutdown conditions.
IP protection levels.
Installation of electrical installation material.
Type of supply network (TN system, IT system, TT system) and the resulting connection conditions (classic zeroing, protective earthing, additional measures required).
| Spaces List (Deprecated) |
|---|
| Recent updates |
|---|